CAN/CSA A277* Rated Factory Built Buildings
The factory built units are constructed at the BTH Building Systems manufacturing facility and transported to the intended dwelling site. When completely assembled, the units are equipped with all normal facilities to connect to municipal services. The units are constructed in one (or more) sections, which are connected at the building site.
The Intertek certification covers the consturction of the building including the factory installation of all stuctural, plumbing, gas, heating and electrical components in compliance with Part 9 of the applicable building codes, and intends to circumvent the necessity to inspect, by local authorities, the above mentioned services. The certification does not cover site connections to municipal services, other units or site mounting features.
APPLICABLE STANDARDS
-
CSA A277* Procedure fo Factory Certification of Buildings
-
National building Code of Canada*
-
Nation Plumbing Code of Canada*
-
CAN/CSA C22.1* Canadian Electrical Code, Part 1
-
CAN/CSA B149.1 Natural Gas and Propane Installation Code
-
British Columbia Building Code*
-
Other Provincial Building Code*, if applicable
*Current Version