Intertek Directory of Building Products

3twenty Solutions, Inc. - Factory Built Buildings Company: 3twenty Solutions Inc.

CSA A277* Rated Factory Built Buildings
 
The factory-built units are constructed at the 3twenty Solutions Inc. manufacturing facility located in Saskatoon, SK and transported to the intended building site. When completely assembled, the units are equipped with all normal facilities to connect to municipal services. The prefabricated units constructed in one (or more) sections, are set onto the building's foundation and joined together at the building site.

The certification applies to in-factory built prefabricated buildings, modules, and panels constructed of any material provided they comply with the requirements of the building code/regulation/standard that apply at the installation location and covers buildings of any occupancy.
The certification does not cover portions of buildings or services that are not completed in the factory, site connections to municipal services, and transport of buildings or their erection at the building site.

The Intertek mark warrants an approved factory quality program and is intended to provide a means of verifying that the prefabricated portion of the building, module, or panel, which may include factory-installed structural, plumbing, heating, and electrical systems, has been designed and built to meet or exceed the requirements of the appropriate building code or standards. 

CSA A277* Rated Factory Built Buildings, as applicable to Alberta Building Code Part 10, Relocatable Industrial Accommodation”

The factory built transportable modules specifically designed to be readily relocatable and usable without permanent foundations, are constructed at the 3twenty Modular facility in Saskatoon, SK, and transported to the intended site.

When completely assembled the units provide accommodation for an industrial work force living and working in a temporary location and meet the requirements of Alberta Building Code Division B Part 10 Relocatable Industrial Accommodation.

The units are constructed in one (or more) sections, which are connected at the building site. The units are used as field offices, construction camp facilities, shops used in conjunction with industrial construction, mobile equipment and other temporary commercial or industrial buildings. When welded steel structures form part of the structure of these units, the manufacturer will be required to obtain Canadian Welding Bureau (CWB) certification to the requirements of CSA W47.1 standard.

This CSA A277 certification program as applicable to Alberta Building Code Part 10, “Relocatable Industrial Accommodation” does not include:
  • Vehicular lighting or brake wiring systems;
  • Validation and balancing of heating, air-conditioning & ventilation systems and plumbing systems, including potable water systems;
  • The 6 or l2V battery operated system for clearance lights etc. which is entirely separate from the l20V system.
APPLICABLE STANDARDS
  • CSA A277* Procedure for Certification of Prefabricated Buildings, Modules, and Panels
  • National Building Code of Canada*
  • National Plumbing Code of Canada*
  • CSA C22.1* Canadian Electrical Code, Part 1
  • CAN/CSA B149.1* Natural Gas and Propane Installation Code
  • National Energy Code of Canada for Buildings*
  • Provincial Building Code* as applicable
*Current version
Listing Report Return to Search
Attributes
CriteriaCSA A277 (2016)
CSI Code13 34 00 Fabricated Engineered Structures
Listing SectionMANUFACTURED HOUSING - FACTORY BUILT MODULAR HOMES
Spec ID27386
Design Documents
No Results
Public Documents
No Results