PRODUCT DESCRIPTION
CSA A277* Prefabricated Buildings
The factory built units are constructed at the Aurora Cascade - Chilliwack, British Columbia manufacturing facility and transported to the intended building site. When completely assembled, the units are equipped with all normal facilities to connect to municipal services. The prefabricated units constructed in one (or more) sections, are set onto the building's foundation and joined together at the building site.
The certification covers in-factory built prefabricated buildings, and partially or fully enclosed modules and panels for buildings of any occupancy.
The Intertek mark warrants an approved in-factory certification procedure, applicable to prefabricated buildings, modules, and panels that complements the required on-site inspection and testing. Intertek also assures the proper fabrication and installation at the plant and adherence to all necessary local codes including structural, plumbing, gas, heating and electrical services and intends to circumvent the necessity to inspect by local authorities, the above mentioned services. The Intertek mark does not cover site connections to municipal services, other not certified units, or site mounting features.
APPLICABLE STANDARDS
-
CSA A277* - Procedure for Certification of Prefabricated Buildings, Modulers, and Panels
-
National Building Code of Canada*
-
National Plumbing Code of Canada*
-
CAN/CSA C 22.1* Canadian Electrical Code, Part 1
-
CAN/CSA B149.1 Natural Gas and Propane Installation Code
-
British Columbia Building Code*
-
Other Provincial Building Code*, if applicable
*Current version